Getting Started with Base Building Plus (BBP)

The Base Building Plus (BBP) mod streamlines construction and offers a multi-tiered building system, allowing you to create more complex and secure bases than the vanilla game.

The BBP Workflow

  1. Find the BBP Book: The key to accessing BBP recipes is the BBP Book. This item is a world spawn (check industrial areas, sheds, etc.) and is non-consumable for the workbench. (or trader if available) Cartel Island DayZ servers has them available at the building trader at Altar for example.
  2. Gather Basic Materials: You will primarily need Planks, Nails, Logs, and construction tools like an Axe and Shovel or Pickaxe.
  3. Build the Workbench: The Workbench is crucial. Once you have the book, you can craft it.
    • Crafting Recipe: Combine 5 Planks + 1 BBP Book.
    • Note: The BBP Book is returned to your inventory after crafting the workbench.
  4. Craft Kits: Interact with the Workbench to open its UI. Here, you can craft the basic Kits (Small Wall Kit, Large Wall Kit, etc.) which are the starting points for all structures.
  5. Place the Kit: Place the kit on the ground where you want your structure to be.
  6. Build the Frame: Use the required materials (Planks and Nails) to build the initial Frame of the structure.
  7. Upgrade Tiers: After the Frame is built, you can upgrade it in progressive Tiers (T1, T2, T3) using various materials:
    • T1 (Wood/Plank): Requires Logs or more Planks.
    • T2 (Metal): Requires the T1 structure to be built, plus Sheet Metal and Nails.
    • T3 (Concrete): Requires Concrete Bricks and a Morter Mix (made from Lime, Sand, and Water/Clay, or simply found) applied with a Shovel or Pickaxe.

Base Building Plus Recipes

The following tables detail the recipes for various BBP structures, organized by function.

Construction Utility & Kits

StructureRecipeTier / Notes
Workbench5 Planks + 1 BBP BookBook is returned upon completion.
Step Ladder Kit10 Planks + 10 Nails
Kit (Small Wall, Floor, etc.)IN WORKBENCH UI: 3 Planks + 3 NailsStarting point for all main structures.
Large Stair10 Nails + 5 Planks
Small Stair5 Nails + 5 Planks
Large Ramp15 Nails + 8 Planks
Tall Pillar (Wood)5 Nails + 2 Planks
Short Pillar (Wood)5 Nails + 1 Plank
Tall Pillar (Concrete)1 Concrete Brick
Short Pillar (Concrete)1 Concrete Brick

Walls and Foundations

StructureFrameT1 Wood/PlankT2 MetalT3 Concrete
Large Wall10 Nails + 5 PlanksFrame + 10 Nails + 2 Logs (or 6 Planks)Frame + T1 Built + 4 Sheet Metal + 10 NailsFrame + 3 Concrete Bricks + 1 Morter Mix (Shovel/Pickaxe)
Small Wall10 Nails + 3 PlanksFrame + 10 Nails + 1 Log (or 3 Planks)Frame + T1 Built + 2 Sheet Metal + 10 NailsFrame + 2 Concrete Bricks + 1 Morter Mix (Shovel/Pickaxe)
Large Half-Wall10 Nails + 3 PlanksFrame + 10 Nails + 1 Log (or 3 Planks)Frame + T1 Built + 2 Sheet Metal + 10 NailsFrame + 2 Concrete Bricks + 1 Morter Mix (Shovel/Pickaxe)
Small Half-Wall5 Nails + 2 PlanksFrame + 10 Nails + 1 Log (or 2 Planks)Frame + T1 Built + 1 Sheet Metal + 5 NailsFrame + 1 Concrete Brick (Shovel/Pickaxe)
Foundation/Triangle10 Nails + 2 LogsFrame + 10 Nails + 8 PlanksFrame + T1 Built + 3 Sheet Metal + 10 NailsFrame + 2 Concrete Bricks + 1 Morter Mix (Shovel/Pickaxe)

Doors and Gates

StructureFrameT1 DoorT2 DoorT3 Door
Large Door10 Nails + 5 PlanksFrame + 10 Nails + 5 PlanksFrame + T1 Door + 15 Nails + 5 Sheet MetalFrame + 15 Nails + 5 Sheet Metal + 5 Planks (Cannot be built over T1 or T2)
Small Door10 Nails + 3 PlanksFrame + 10 Nails + 5 PlanksFrame + T1 Door + 15 Nails + 5 Sheet MetalFrame + 15 Nails + 5 Sheet Metal + 5 Planks (Cannot be built over T1 or T2)

Note: The T1, T2, and T3 Door upgrades listed in the source text appear to be separate from the main Frame structure upgrades. The main structure’s Tiers (Wood/Plank, Metal, Concrete) are listed for completeness, but T1/T2/T3 Door recipes are specifically for the door panel itself.

Gate/GarageFrameT1 WoodT2 MetalT3 Concrete
Large Gate (R/L)10 Nails + 4 PlanksFrame + 24 Nails + 16 PlanksFrame + T1 Built + 4 Sheet Metal + 20 NailsFrame + 3 Concrete Bricks + 1 Morter Mix (Shovel/Pickaxe)
Single Garage Door10 Nails + 4 PlanksFrame + 24 Nails + 16 PlanksFrame + T1 Built + 4 Sheet Metal + 20 NailsFrame + 3 Concrete Bricks + 1 Morter Mix (Shovel/Pickaxe)
Double Garage Door10 Nails + 4 PlanksFrame + 12 Nails + 8 Planks (x2 Door)Frame + T1 Door + 10 Nails + 2 Sheet Metal (x2 Door)Frame + 1 Concrete Brick + 1 Morter Mix (x2 Door)

Floors and Roofs

StructureFrameT1 Wood/PlankT2 MetalT3 Concrete
Large Floor/Roof10 Nails + 5 PlanksFrame + 10 Nails + 8 PlanksFrame + T1 Built + 3 Sheet Metal + 10 NailsFrame + 2 Concrete Bricks + 1 Morter Mix (Shovel/Pickaxe)
Small Floor/Roof5 Nails + 3 PlanksFrame + 5 Nails + 3 PlanksFrame + T1 Built + 1 Sheet Metal + 5 NailsFrame + 1 Concrete Brick (Shovel/Pickaxe)
Large Triangle Floor/Roof10 Nails + 3 PlanksFrame + 10 Nails + 5 PlanksFrame + T1 Built + 2 Sheet Metal + 10 NailsFrame + 1 Concrete Brick + 1 Morter Mix (Shovel/Pickaxe)
Large Slope Roof10 Nails + 5 PlanksFrame + 10 Nails + 8 PlanksFrame + T1 Built + 3 Sheet Metal + 10 NailsFrame + 2 Concrete Bricks + 1 Morter Mix (Shovel/Pickaxe)
Large Hanger Roof (R/L)10 Nails + 5 PlanksFrame + 24 Nails + 16 PlanksFrame + T1 Built + 4 Sheet Metal + 20 NailsFrame + 3 Concrete Bricks + 1 Morter Mix (Shovel/Pickaxe)

Hatches and Windows

StructureFrameT1 Wood/PlankT2 MetalT3 Concrete
Large Floor/Roof Hatch10 Nails + 5 PlanksFrame + 10 Nails + 6 PlanksFrame + T1 Built + 3 Sheet Metal + 10 NailsFrame + 2 Concrete Bricks + 1 Morter Mix (Shovel/Pickaxe)
Large Window10 Nails + 5 PlanksFrame + 10 Nails + 2 Logs (or 8 Planks)Frame + T1 Built + 4 Sheet Metal + 10 NailsFrame + 3 Concrete Bricks + 1 Morter Mix (Shovel/Pickaxe)
Small Window(No Frame listed in source – assume similar to Small Wall)Frame + 10 Nails + 1 Log (or 3 Planks)Frame + T1 Built + 2 Sheet Metal + 10 NailsFrame + 1 Concrete Brick + 1 Morter Mix (Shovel/Pickaxe)
Window/Hatch CoverBase/FrameT1 HatchT2 HatchT3 Reinforced Hatch
Large HatchFrame (10 Nails + 5 Planks)Frame + 10 Nails + 5 PlanksFrame + T1 Hatch + 10 Nails + 4 Sheet MetalFrame + 5 Planks + 4 Sheet Metal + 20 Nails
Large Window HatchFrame (10 Nails + 5 Planks)Frame + 5 Nails + 2 PlanksFrame + T1 Hatch + 5 Nails + 2 Sheet MetalFrame + 5 Planks + 3 Sheet Metal + 10 Nails
Small Window HatchFrame (10 Nails + 3 Planks)Frame + 5 Nails + 2 PlanksFrame + T1 Hatch + 5 Nails + 2 Sheet MetalFrame + 5 Planks + 2 Sheet Metal + 5 Nails

Misc Metal Structures

StructureFrame / T1T2 / Upgrade
Barbwire BarrierT1 Frame = 10 Nails + 2 LogsBarbwire = 10 Nails + 1 Barbwire
Chain Link FenceFrame = 10 Nails + 2 Sheet MetalT2 Fence = 10 Nails + 2 Sheet Metal; Barbwire = 10 Nails + 1 Barbwire
Chain Link GateFrame = 10 Nails + 2 Sheet MetalT2 Gate (x2) = 10 Nails + 1 Sheet Metal; Barbwire = 10 Nails + 1 Barbwire
Metal Floor MeshFrame = 10 Nails + 1 Sheet MetalT2 Floor = 10 Nails + 2 Sheet Metal
Metal StairsMetal Stair = 10 Nails + 1 Sheet MetalRailing (x2) = 3 Nails + 1 Sheet Metal